Skip to main content
menu
menu
EN
English
EN
English
GA
Gaeilge
login
Login to Portal
Register
Login to Portal
Register
Fingal.ie
Home
Consultations
Surveys and Forms
Home
Consultations
Proposed Part VIII - Holywell Pumping Station Relocation
6(i). Drawing C009 - Proposed Drainage Layout
6(i). Drawing C009 - Proposed Drainage Layout
Proposed Part VIII - Holywell Pumping Station Relocation
Closed
date_range
20 Mar, 2017, 8:54am
-
24 May, 2017, 5:00pm
Share
Contents
Home
1. Atkins Report - Introduction
2. Atkins Report - Background
3. Atkins Report - Proposed Works
4. Atkins Report - Drawing List
5. Atkins Report - Appendix
keyboard_arrow_right
6. Atkins Report - Drawings
6(a). Drawing C001 - Site Location Map
6(b). Drawing C002 - Site Layout Plan 1-500
6(c). Drawing C003 - Proposed Site Layout Plan 1-500
6(d). Drawing C004 - Proposed site Layout Plan 1-250
6(e). Drawing C005 - Proposed Site Layout Plan 1-100
6(f). Drawing C006 - Proposed Pumping Station Site Layout
6(g). Drawing C007 - Section a
6(h). Drawing C008 - Existing Drainage Layout
6(i). Drawing C009 - Proposed Drainage Layout
6(j). Drawing C0010 - Standard Construction Details 1 of 3
6(k). Drawing C011 - Standard Construction Details 2 of 3
6(l). Drawing C012 - Standard Construction Details 3 of 3
7. Fingal Co Co - Planning Report
8. Fingal Co Co Heritage Officers Report
9. Fingal Co Co Parks Report
10. Fingal Co Co Transportation Report
11. Fingal Co Co Water Services Report
12. Supporting Documentation