1. Atkins Report - Introduction

Closed20 Mar, 2017, 8:54am - 24 May, 2017, 5:00pm

 

Holywell Foul Pumping Station Relocation

Part 8 Planning Report

Fingal County Council

 

13 February 2017

 

This report outlines the preliminary assessment of the engineering requirements for the Proposed Holywell Foul Pumping Station relocation at Holywell, Swords, Co. Dublin. The proposed works will comprise of the construction of the foul pumping station including underground Wet Well, Valve Chamber, Emergency Overflow Chamber, 24 Hour Storage Tank, Inlet manhole, Meter chamber, overground Wet Kiosk, Control Kiosk, Vent Stack and associated works to allow for the diversion, construction and decommissioning of existing services, utilities and pumping station.

 

A site visit was carried out with Fingal County Council (FCC) on the 6th of February 2017 and a pre-planning meeting with FCC was held on the 8th of February 2017 to discuss the proposed pumping station. The intent of this Planning Report is to provide information to FCC planning department in support of the part 8 planning application and does not represent an exhaustive design of services.

 

The existing Holywell development comprises of approximately 1,188 mixed unit housing, local shopping centre and an Educate Together Primary School. Refer to figure 1-1 below for Site Location Map.

 Figure 1-1 Site Location Map