Léim go dtí an príomh-inneachar
menu
menu
GA
Gaeilge
EN
English
GA
Gaeilge
login
Logáil isteach sa Tairseach
Cláraigh
Logáil isteach sa Tairseach
Cláraigh
Fingal.ie
Baile
Comhairliúcháin
Suirbhéanna agus Foirmeacha
Baile
Comhairliúcháin
Proposed Part VIII - Holywell Pumping Station Relocation
6(i). Drawing C009 - Proposed Drainage Layout
6(i). Drawing C009 - Proposed Drainage Layout
Proposed Part VIII - Holywell Pumping Station Relocation
Dúnta
date_range
20 Már, 2017, 8:54am
-
24 Bea, 2017, 5:00pm
Roinn
Clár ábhair
Baile
1. Atkins Report - Introduction
2. Atkins Report - Background
3. Atkins Report - Proposed Works
4. Atkins Report - Drawing List
5. Atkins Report - Appendix
keyboard_arrow_right
6. Atkins Report - Drawings
6(a). Drawing C001 - Site Location Map
6(b). Drawing C002 - Site Layout Plan 1-500
6(c). Drawing C003 - Proposed Site Layout Plan 1-500
6(d). Drawing C004 - Proposed site Layout Plan 1-250
6(e). Drawing C005 - Proposed Site Layout Plan 1-100
6(f). Drawing C006 - Proposed Pumping Station Site Layout
6(g). Drawing C007 - Section a
6(h). Drawing C008 - Existing Drainage Layout
6(i). Drawing C009 - Proposed Drainage Layout
6(j). Drawing C0010 - Standard Construction Details 1 of 3
6(k). Drawing C011 - Standard Construction Details 2 of 3
6(l). Drawing C012 - Standard Construction Details 3 of 3
7. Fingal Co Co - Planning Report
8. Fingal Co Co Heritage Officers Report
9. Fingal Co Co Parks Report
10. Fingal Co Co Transportation Report
11. Fingal Co Co Water Services Report
12. Supporting Documentation