Waste Water Network south of Balbriggan

Uimhir Thagarta Uathúil: 
FIN-C532-47
Stádas: 
Submitted
Údar: 
Sean Barry
Líon na ndoiciméad faoi cheangal: 
3
Teorainneacha Gafa ar an léarscáil: 
Údar: 
Sean Barry

Tráchtanna

CHAPTER 11: Infrastructure and Utilities

Select, where provided, the reference for the amendment on which you wish to comment , or for flood maps, the drawing ref number: 

With reference to: "PA CH 11.3: Section 11.5.1, Water Supply and Wastewater, page 391 Delete Existing Table 11.1 and insert Updated Table 11.1 as shown below:", under the column "Wastewater Network" for Balbriggan, an amendment needs to be made to include work done to the existing network south of Balbriggan, from the Harbour to Hampton Cove, including the Bower to address the regular Sewage Overflows that regularly occur into the sea, especially along the length of the Hampton Cove green.

Photos taken at beach of runoff from sewage system adjacent to manhole covers and long overflow pipe in the middle of Hampton Cove are attached.

Suímh a bhaineann leis an aighneacht seo agus le tráchtanna

Faisnéis

Uimhir Thagarta Uathúil: 
FIN-C532-47
Stádas: 
Submitted
Líon na ndoiciméad faoi cheangal: 
3
Teorainneacha Gafa ar an léarscáil: