Uimhir Thagarta Uathúil: 
FIN-C453-1301
Stádas: 
Submitted
Aighneacht: 
Údar: 
Cllr Brian Dennehy

Chapter 6: Connectivity and Movement

Preserve the tree lined approach on the Whitestown Road Rush beginning at the area at Old Road / Whitestown Road in the direction of Rush Mainstreet.

Facilitate provision of a complete pedestrian linkage on the western side of the Park Road, Rush from the Brook Lane / Park Road junction to St. Maurs GAA Club entrance.

Upgrade Brook Lane, Rush to Distributor Road standard whilst ensuring the rural and amenity character is protected.

Carry out an assessment of traffic needs to inform the feasibility of providing a Distributor Road to the west of Rush.

Promote and facilitate the linkage by means of public pathway the Martello Tower on the Drumanagh Promontory Fort site, Rush to a public walkway around the perimeter of the Drumanagh Promontory Fort, Rush

Implement in full the measures outlined in ‘The Landfill Restoration Plans’ in the Rogerstown Estuary Study and provide for a landscaped public amenity space incorporating woodland and screen planting, pathways and seating areas, carparking, visitors centre and a boardwalk southwards alongside the railway line to Donabate.

That this Council resolves that "all roads in residential area’s of Fingal included to be resurfaced in the annual works programmes should be resurfaced with tarmacadam producing reduced noise levels from passing traffic."