Uimhir Thagarta Uathúil: 
FIN-C453-1136
Stádas: 
Submitted
Aighneacht: 
Údar: 
Stephen Mckenna

Strategic Flood Risk Assessment

27. A water quality survey to be carried out on the Brook Stream & St Catherine’s Stream, Rush in
the first three years of the development plan.
31. Connection of the Rush mains sewage network be provided in the lifetime of the development
plan for the housing adjacent to the North beach Rush covering the area from the Six Cross Lanes /
R128 junction to the Brook stream where it enters the North Beach.
32. The area of the Sundrive Road currently remaining unconnected to the Rush Sewage network to
be connected to the mains system in the lifetime of this Development Plan.
36. The construction of a secondary culvert along the Channel Road be constructed and completed
to protect the properties at risk of fluvial flooding along the West Rush Stream as detailed on CFRAM
and the 2017-2023 Strategic Flood Risk