Chapter 11: Infrastructure and Utilities

 

Chapter 11: Infrastructure and Utilities

27. A water quality survey to be carried out on the Brook Stream & St Catherine’s Stream, Rush in the first three years of the development plan.

31. Connection of the Rush mains sewage network be provided in the lifetime of the development plan for the housing adjacent to the North beach Rush covering the area from the Six Cross Lanes / R128 junction to the Brook stream where it enters the North Beach.

32. The area of the Sundrive Road currently remaining unconnected to the Rush Sewage network to be connected to the mains system in the lifetime of this Development Plan.

36. The construction of a secondary culvert along the Channel Road be constructed and completed to protect the properties at risk of fluvial flooding along the West Rush Stream as detailed on CFRAM and the 2017-2023 Strategic Flood Risk assessment for Fingal Development Plan 2017-2023 item 6.1.7 Rush.