Notice of Further Information in respect of a Direct Planning Application to An Bord Pleanála in respect of Irish Water Strategic Infrastructure Development: Greater Dublin Drainage Project.
Notice of Further Information in respect of a Direct Planning Application to An Bord Pleanála in respect of a Strategic
Infrastructure Development: Greater Dublin Drainage Project
(A Proposed Wastewater Treatment Plant, Orbital Sewer, Outfall Pipeline, Sludge Hub Storage Centre and Regional Biosolids Storage Facility – ABP REF. 301908-18)
County Fingal & Dublin City
In accordance with Section 37F of the Planning and Development Act 2000, as amended, and following a request made by ABP made under the provisions of this section of the Act, Irish
Water gives notice of the submission of information previously inadvertently omitted from the EIAR which accompanied the planning application (lodged on the 20th June, 2018):
• It has come to the attention of Irish Water that in relation to the documents which were lodged for public inspection with An Bord Pleanála, Fingal County Council at their Offices in Swords, Co. Dublin and Blanchardstown, Dublin 15 and the Offices of Dublin City Council, Wood Quay, Dublin 8, and available on the website www.gddapplication.ie, some documentation forming part of the Environmental Impact Assessment Report (EIAR) were inadvertently omitted. A list of the omitted documents is outlined as follows:
The following Appendices were omitted from EIAR Volume 2 Part B from all formats – the hard copies, soft copies and website:
|
EIAR Chapter |
Appendix Number |
Title |
5 |
Consideration of Alternatives |
2E |
RBSF - Stage 3 Consultation Report |
4D |
RBSF Stage 1 Report – Site Selection Methodology |
||
4E |
RBSF Stage 2 Report – Identification of Potential Sites |
||
4F |
RBSF Stage 3 Report – Identification of Preferred Site |
The following Appendices were omitted from EIAR Volume 3 Part B from all formats – the hard copies, soft copies and website:
|
EIAR Chapter |
Appendix Number |
Title |
18 |
Soils and Geology |
18.1 |
Summary Report on the Bathymetric and Geophysical Data Integration for the GDD Scheme for TechWorks Marine |
Report on the Geophysical Investigation for GDD Scheme, Offshore Portmarnock |
|||
Report on the Geophysical Investigation for GDDP Portmarnock Golf Course, Dublin |
|||
Greater Dublin Drainage Offshore Site Investigation of Outfall Pipeline |
|||
Greater Dublin Drainage Scheme – Sub Bottom Analysis |
|||
Greater Dublin Drainage Scheme – Hydrographic Survey Report GE013_GDD |
|||
Greater Dublin Drainage Scheme Fingal County Council TW/12/PRJ-007 |
|||
Greater Dublin Drainage Scheme Preliminary Ground Investigation Contract – Phase 1 Factual Report on Ground Investigation (Report No. 16695) |
The following Figures were omitted from EIAR Volume 5 from all formats – the hard copies, soft copies and website:
|
EIAR Chapter |
Appendix Number |
Title |
11 |
Biodiversity (Terrestrial & Freshwater Acquatic) |
2.1 |
Manual Transect Routes from Blanchardstown to Dublin Airport, 2017 |
20 |
2.2 |
Manual Transect Routes from Dublin Airport to Portmarnock, 2017 |
|
21 |
Waste |
20.1 |
Location of Active Landfills in Study Area |
|
Material Assets |
21.1 |
Gas Transmission Infrastructure – Location of Crossing Points with Proposed Pipeline Routes |
|
21.2 |
Power Transmission Infrastructure – Location of Crossing Points with Proposed Pipeline Routes & Wastewater Treatment Plant Site |
|
21.3 |
Railway Transmission Infrastructure – Location of Crossing Points with Proposed Pipeline Routes |
||
21.4 |
Dublin to Belfast Railway – Proposed Trenchless Crossing |
||
21.5 |
N2 National Road – Proposed Trenchless Crossing |
||
21.6 |
Collinstown Cross – Proposed Trenchless Crossing |
||
21.7 |
M1 Motorway – Proposed Trenchless Crossing |
||
21.8 |
Water Supply Infrastructure – Crossing Points with Proposed Pipeline Routes |
||
21.9 |
Watercourses – Crossing Points with Proposed Pipeline Routes |
||
21.10 |
Quarry Locations in Greater Dublin Region |
The following pages of the Greater Dublin Drainage Strategy: Overview and Future Strategic Needs report were omitted from the hard copy of the Planning Documentation Folder of the EIAR.
Please note that the full document (including pages 30 – 48) has been available on the website: www.gddapplication.ie since 20th June 2018.
• Page 30 to Page 48 inclusive
The RBSF Construction Environmental Management Plan was omitted from the hard copy of the Planning Documentation Folder of the EIAR. Please note that the full document has been available
on the website: www.gddapplication.ie www.gddapplication.ie since 20th June 2018.
• The information contained on the website: www.gddapplication.ie has already been updated.
• The information highlighted above may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy)
during public opening hours at the following locations:
- The offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1, between the hours of 9.15 a.m. to 5.30 p.m. Monday to Friday;
(ii) The offices of Fingal County Council, Planning Counter, County Hall, Main Street, Swords, Co. Dublin, between the hours of 9.00 a.m. to 5.00 p.m. Monday to Thursday and between the hours of 9.00 a.m. to 4.30 p.m. on Friday;
(iii) The offices of Fingal County Council, Planning Counter, Grove Road, Blanchardstown, Dublin 15, between the hours of 9.30 a.m. to 4.30 p.m. Monday to Thursday and between the hours of 9.30 a.m. to 4.00 p.m. on Friday; and
(iv) The offices of Dublin City Council, Planning Counter, Ground Floor, Civic Offices, Wood Quay, Dublin 8, between the hours of 9.00 a.m. to 4.30 p.m. Monday to Friday.
Any objections or submissions may be made in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1, from 13th September 2018, for a period of 5 weeks up to 5.30pm 18th October 2018,
both dates inclusive.
Any person who has already paid the observer fee of €50 need not do so again in respect of a submission/observation.