R132 Connectivity Project - Non-Statutory Consultation

Dúnta17 Sam, 2020, 9:00am - 18 Nol, 2020, 11:59pm

Primary tabs

R132 CONNECTIVITY PROJECT

A live online webinar will take place at 7.00pm on Tuesday 15th December 2020. To register your interest in taking part in this event please e-mail planningwebinar@fingal.ie by Sunday 13th December 2020 indicating your name or organisation that you are representing.

Your attention is also drawn to the R132 Connectivity Project FAQ's Document listed in the materials documentation. 

Fingal County Council, in conjunction with the National Transport Authority is proposing to carry out upgrade works to the R132 in Swords. The proposed works include the following:

  1. Upgrade works between the north of Pinnock Hill Roundabout and north of Estuary Roundabout, to facilitate installation of new protected cycle and pedestrian facilities, retention of one bus and one general traffic lane in each direction, removal of hard shoulders and/or general traffic lanes, and reduction in speed limit to 50km/h

Proposed Route Corridor

  1. Three new signal controlled crossing points provided along the R132 located as follows:

a. North of Pinnockhill Roundabout

b. Adjacent existing Chapel Lane/Ashley Avenue overbridge

c. North of Estuary Roundabout

  1. The following three existing roundabouts will be changed to signalised intersections to facilitate pedestrian and cyclist facilities:

a. Malahide Road Roundabout

b. Seatown Roundabout

c. Estuary Roundabout

Proposed Estuary Junction Upgrade

  1. Partial/full closure of Drynam Road connection to the R132/Malahide Road Roundabout

Submissions or observations on the proposed scheme may be made from 17th of November 2020 and must arrive no later than 5pm on 15th of December 2020 

Public Consultation Submission Closing Date EXTENDED to Friday 18th of December 2020.

Written submissions must be received by 4.30pm Friday 18th December 2020 or online submissions by 11.59pm Friday 18th December 2020.

Submissions/Observations may be made as follows:

• Online at: https://consult.fingal.ie/en/browse or

• In writing to: Senior Executive Officer, Planning and Strategic Infrastructure Department, Fingal County Council, County Hall, Main Street, Swords, Co. Dublin, K67 X8Y2

If you have a query about making your submission or questions about the plans, you may contact us at: Email: Fingal.DevelopmentPlan@fingal.ie

A hard copy of the full set of drawings can be made available for purchase for a fee of €30, upon prior request to Fingal.DevelopmentPlan@fingal.ie

Please make your submission or observation by one medium only i.e. online or in writing. Clearly mark your submission as for the R132 CONNECTIVITY PROJECT.

Data Protection

Submissions will be published including the names and locations (not addresses) of those making the submission. All submissions should include your name or the name of the organisation and contact details (personal contact details will not be published).

Details of our privacy policy in relation to this submission are available on the online consultation portal above.

Téamaí

Ginearálta
Glac síntiús